Infrastructure
All lots have:
- Wide fronts with access to public road in good maintenance condition
- Cemented or gravelled public road with night lightning
- Electricity connection close to the lot (overground)
- Internet ICE Kölbi
- Water connection to the lot (underground), ASADA of Grifo Alto
- Level ground areas to build, optionally to be extended